Camp Campbell Bridge Renovation Project

3 Documents in Project

Summary

SCH Number
2009012045
Lead Agency
Santa Cruz County
Document Title
Camp Campbell Bridge Renovation Project
Document Type
NOD - Notice of Determination
Received
Posted
8/10/2009
Document Description
Aron Faegre (Applicant) is proposing to renovate an existing bridge spanning the San Lorenzo River at Camp Campbell to comply with American Association of State Highway and Transportation Officials (AASHTO) design criteria, requested by the Boulder Creek Fire District as a fire safety issue. The bridge is located on the main entrance of Camp Campbell and provides the primary access to the camp. The Applicant is proposing to add two supplemental steel beams. To further strengthen the bridge the existing wooden deck planks would be replaced. The Project would also consist of widening the bridge to create an accessible path along side the driving lane that meets standards set by the Americans with Disabilities Act (ADA). The existing abutments and approach roads would not be modified, and no new concrete or paving work is planned. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number 1600-2009-0107-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Aron Faegre and Associates.

Contact Information

Name
Suzanne DeLeon
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Santa Cruz
Cross Streets
Highway 9 and Bucknoll
Zip
95006
Total Acres
67
Parcel #
085-101-19 and 085-121-07
State Highways
9
Waterways
San Lorenzo River
Other Location Info
Boulder Creek

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.