LaPorte Road Over New York Creek Bridge Replacement Project

2 Documents in Project

Summary

SCH Number
2009012032
Lead Agency
Yuba County
Document Title
LaPorte Road Over New York Creek Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received

Document Description
The California Department of Fish and Game is executing lake or Streambed Alteration Agreement number 1600-2009-0148-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Yuba County Department of Public Works. The existing bridge on LaPorte Road over New York Creek will be replaced will a new bridge. The proposed single-spam concrete replacement bridge would be constructed downstream of the existing bridge so the existing could remain in service during new bridge construction. The shift in bridge alignment and new roadway approach would bring the bridge and roadway up to modern road standards and would improve driver safety. The proposed single-span concrete replacement bridge would be 50 ft long and 33 ft wide. This project include the removal of the existing bridge structure.

Contact Information
Gary L Hobgood
Dept. of Fish and Game
1701 Nimbus Road, Suite A
Sacramento, CA 95670

916-983-6920

Location

Coordinates
°28'44"N 121°15'14"W
Counties
Yuba
Cross Streets
La Porte Road and New York Flat Road
Zip
95919
Total Acres
8.91
Waterways
New York Creek
Township
19N
Range
6E
Section
25
Base
MDB&M
Other Location Info
City/Nearest Community: Brownsville

Notice of Determination

Approving Agency
Dept. of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
915 Eighth Street, Suite 123 Marysville, CA 95901

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search