Wildwood Creek Basin Project

3 Documents in Project

Summary

SCH Number
2009011105
Lead Agency
City of Yucaipa
Document Title
Wildwood Creek Basin Project
Document Type
NOD - Notice of Determination
Received
Posted
4/13/2010
Document Description
The Applicant is proposing to construct one desilting basin with an approximate capacity of 14.5 acre ft, two detention basins with a combined capacity of ~75 ac-ft, and an ~50 ft wide natural bottom channel/low-flow bypass channel. Wildwood Creek, two unneamed tributaries, and the adjacent upland areas will be excavated, and rip-rap, soil cement, and concrete box culverts will be installed in order to construct the proposed basins and low-flow bypass channel. In addition, access roads composed of native materials will be constructed to allow entry into the basins for maintenance purposes. A public rest area, parking lot, and interpretive kiosk will be constructed between the northern extent of the basins and the south side of Wildwood Canyon Road. Public trails composed of native materials will be also constructed along the perimeter of the basins. The desilting basin, detentions low-flow bypass channel, access roads, rest area, parking lot, and trails will be subject to long-term maintenance.

Contact Information

Name
Ms. Anna Milloy
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Yucaipa
Counties
San Bernardino
Cross Streets
Southeast of intersection at Holmes Street and Wildwood Canyon Road
Zip
92399
Total Acres
25
Parcel #
124227103, 124235112, 12423
State Highways
No
Railways
No
Airports
No
Schools
Yucaipa - Calimesa USD
Waterways
Wildwood Creek

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.