R2006-02565

2 Documents in Project

Summary

SCH Number
2009011071
Lead Agency
Los Angeles County
Document Title
R2006-02565
Document Type
NOD - Notice of Determination
Received
Posted
4/9/2009
Document Description
The proposed project consists of a 29,905 retail center that includes 18,995 sf of retail floor area, a 2,500 sf carwash, 875 sf of second floor offices, a 3,375 sf automobile service station and a 4,200 sf automobile service station. Light automobile maintenance but not fuel sales is proposed at the automobile service stations. 11,500 sf (or 11.5%) of landscaping is provided throughout the site. 154 parking spaces are provided including three handicapped spaces. A 6 ft high stucco-coated masonry wall is proposed on the easterly boundary. Four trash enclosures with 6 ft high finished masonry matching the associated buildings are located near each primary use. Two monument signs (6 ft high by 6 ft wide and 10 ft high by 8 ft wide) are proposed on the southerly and southwesterly portions of the site. Auto queuind areas are proposed for carwash drying (16 spaces), vacuum area (9 spaces), and lube ingress (9 spaces) and lube egress (9spaces).

Contact Information

Name
Dean Edwards
Agency Name
Los Angeles County
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Cross Streets
Avenue L and 50th Street
Zip
93536
Total Acres
2.3
Parcel #
3103-001-002, -003
Schools
Joe Walker Middle
Township
7N
Range
13W
Section
36
Base
SBB&M
Other Location Info
City/Nearest Community: Quartz Hill

Notice of Determination

Approving Agency
Regional Planning Commision
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print