Villa Trinidad (Site 1290) Vector Habitat Remediation Program Project

6 Documents in Project

Summary

SCH Number
2009011067
Lead Agency
San Diego County
Document Title
Villa Trinidad (Site 1290) Vector Habitat Remediation Program Project
Document Type
NOD - Notice of Determination
Received
Posted
12/9/2014
Document Description
CDFW is intending to execute a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code (#1600-2014-0124-R5) to the project applicant, City of San Diego Park & Recreation Department. The Project consists of design and implementation of a drainage improvement that would eliminate mosquito breeding habitat by removing a scour pond, sediment, and non-native vegetation in order to restore native wetland habitat and allow free-flowing drainage. Project activities include installation of grouted rip rap and gabions at the mouth of an existing storm drain outfall; modification of the channel flow line to a more uniform grade from the outfall to a location approximately 100 feet downstream; and removal of invasive trees, such as eucalyptus, that fall and restrict flow. In order to provide mitigation for the energy dissipation structure, removal of invasive plant species and planting of native vegetation will be performed extending downstream of the grading activities by approximately 150 feet.

Contact Information

Name
Kelly Fisher
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Other Location Info
County and local city jurisdictions

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print