Boat Central
3 Documents in Project
Summary
SCH Number
2009011058
Lead Agency
Los Angeles County
Document Title
Boat Central
Document Type
NOD - Notice of Determination
Received
Posted
5/15/2013
Present Land Use
The GPD for the project site is Specific Plan. The site is zoned Specific Plan and the Local Coastal Plan designation is Public Facilities
Document Description
The Project consists of the demolition of a temporary parking lot and construction of a dry stack boat storage facility, mast-up boat storage area, office and customer lounge, a Sheriff's Boatwright office/ Lifeguard facility (office space and repair yard), a public promenade, view park and new dock structures. The dry stack storage facility will accommodate a maximum of 345 boats up to 40 feet in length and 28 boat trailers. Outdoor dry storage space for 30 mast-up sailboats will be created in the north-eastern corner of the site within a fenced area. A paved parking lot containing 134 spaces will be constructed between the dry stack storage facility and the office building with 13 additional parking spaces available via valet service.
Contact Information
Name
Anita Gutierrez
Agency Name
Los Angeles County
Contact Types
Lead/Public Agency
Phone
Location
Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
13483 Fiji Way (Intersection of Admiralty Way and Fiji Way)
Total Acres
4.25
State Highways
Hwy 1 PCH
Railways
No
Airports
LAX
Schools
Westchester HS, Couer D'Alene ES, Mark Twin MS
Waterways
Pacific Ocean
Other Location Info
Marina Del Rey
Notice of Determination
Approving Agency
LA County Regional Planning
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.