Gilardi Road Bridge Replacement Project, Agreement 2009-0011-R4.

3 Documents in Project

Summary

SCH Number
2009011057
Lead Agency
California State Polytechnic University, San Luis Obispo
Document Title
Gilardi Road Bridge Replacement Project, Agreement 2009-0011-R4.
Document Type
NOD - Notice of Determination
Received
Posted
9/1/2009
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant, Mr. Edralin Maduli. The proposed project consists of removing an existing bridge and building a new bridge in its place. The existing bridge is a 23 feet wide, 79 feet long, 4-span timber bridge has been closed to vehicular use due to safety concerns. The existing bridge would be removed and replaced with a new two-lane bridge. The existing piers would be cut 1-foot below streambed elevation and the bridge removed in one piece. The existing abutments would be left in place to maintain bank stability. New abutments would be constructed of concrete poured outside the stream channel. A new prefabricated single span bridge would be placed on the new abutments. Potentially hazardous materials such as lead paint, creosote laden timbers, and other materials form the existing bridge would be removed and disposed of at a facility licensed to accommodate such materials. The site would be stabilized and revegetated using native plant species.

Contact Information

Name
Michael Multari
Agency Name
California State Polytechnic University, San Luis Obispo
Contact Types
Lead/Public Agency

Location

Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
Highway 1 and Gilardi Road
Zip
93405
Total Acres
382
Parcel #
073-211-009
State Highways
1
Waterways
Walters Creek (tributary to Chorro Creek)
Township
30S
Range
11E

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print