Solar Energy Project for the San Joaquin County Robert J. Cabral Agricultural Center.

Summary

SCH Number
2008128080
Public Agency
San Joaquin County
Document Title
Solar Energy Project for the San Joaquin County Robert J. Cabral Agricultural Center.
Document Type
NOE - Notice of Exemption
Received
Posted
12/8/2008
Document Description
The project includes acquisition, planning, design, purchase of equipment, and construction of a solar project for the San Joaquin County Agricultural Center. The purpose of this project is to stimulate economic development by financing a public project that will provide near term results and economic benefits, including job creation, consistent with the area's strategic plan. The project is to be completed in two phases. Phase One is a 63 kW (DC) roof mounted, fixed tilt solar electricity photovoltaic generating system on the roof of the Main Building. The Phase one project is anticipated to offset approx. 15% of the expected Agricultural center's electric usage. Phase Two is for a solar electric generating system to be mounted on covered parking structures in the Corporation Yard, on covered parking structures in the Staff-Public Parking Area, and on the roof of the Warehouse-Support Building (if needed). The combined Phase One and Phase Two projects are anticipated to offset close to 100% of the Agricultural Center's expected usage. The agricultural Center is located on the north side of Earhart Avenue, approx. 1250 ft south and east of Airport Way, in Stockton.

Contact Information

Name
Chandler Martin
Agency Name
San Joaquin County Community Development Department
Contact Types
Lead/Public Agency

Location

Counties
San Joaquin

Notice of Exemption

Exempt Status
Ministerial
Type, Section or Code
21080(b)(1); 15268
Reasons for Exemption
This is a County project on County owned land and no permits are required. If the County were to require a permit, only an Improvement Plan and building permits would be required, which are ministerial items. This site is zoned M-X and is located within the Stockton Airport Special Purpose Plan area. Projects consistent with the Special Purpose Plan are subject to design review but are ministerial.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.