Building Site Approval & Grading Approval

3 Documents in Project

Summary

SCH Number
2008122102
Lead Agency
Santa Clara County
Document Title
Building Site Approval & Grading Approval
Document Type
NOD - Notice of Determination
Received
Posted
2/2/2009
Document Description
This application is for Single Building Site Approval and Grading Approval, to construct a new single-family residence with attached garage, septic system, driveway and improvement to the existing access road. The size of the proposed single story house is approximately 4,875 square feet. The proposed residence and other associated improvements will entail grading of approximately 1,672 cubic yards of cut and 190 cubic yards of fill. The site is approximately 18.29 acres and the entire project scope covers about 3% of the lot area. The location and extent of the roadwork, along with the location of the proposed house, leach fields and other improvements are shown on plans and are on file at the County Planning Office. The site is located in the Habitat Conservation Plan area and provides aestivation habitat to a number of special status plant and animal species. Tree replacement and oak woodland habitat mitigation, is required for the 38 "oak tree proposed to be removed. Land Use Approvals necessary to construct the project include Building Site Approval and Grading Approval.

Contact Information

Name
Priya Cherukuru
Agency Name
Santa Clara County
Contact Types
Lead/Public Agency

Location

Cities
Gilroy
Counties
Santa Clara
Cross Streets
Day Road and Watsonville Road
Zip
95020
Total Acres
18.29
Parcel #
783-12-013

Notice of Determination

Approving Agency
Santa Clara County
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print