Proposition 50 Pipeline, Water Treatment and Storage Project SAA 1600-2009-0004

3 Documents in Project

Summary

SCH Number
2008122074
Lead Agency
City of Jackson
Document Title
Proposition 50 Pipeline, Water Treatment and Storage Project SAA 1600-2009-0004
Document Type
NOD - Notice of Determination
Received
Posted
2/1/2010
Document Description
The project proposes to construct a newly dedication water conveyance pipeline ~3.6 miles in length from Lake Pardee to a treatment facility located at Lake Amador Recreation Area (LARA) and then into the Jackson Valley servicing customers along the way. A 350 gallon per minute water treatment plant, and a 300,000 gallon storage tank will be incorporated into the system at the LARA facility. There will be a 16" raw water pipeline that will travel from the North Spillway of Lake Pardee down the Carson Creek Drainage to the treatment facility (a 1.1 mile section of pipeline). The route travels over rangeland which includes, California annual grasslands and Blue oak woodlanks while crossing three different creeks and drainages along the route. From the treatment facility into the valley there will be an 8" treated water pipeline installed that will take advantage of already existing roads and road easements until termination near the Oaks Community.

Contact Information

Name
Amy Kennedy
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Ione
Counties
Amador
Cross Streets
Jackson Valley Road and Buena Vista Road
Zip
95640
Total Acres
130
Parcel #
various
State Highways
88
Waterways
Jackson Creek
Township
5N
Range
10E
Section
8,9,16
Base
MDB&M

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print