Lake Forest Stream Environment Zone and Wildlife Enhancement Phase of the Lake Forest Erosion Control Project Area B (SEZ and Wildlife Phase)

9 Documents in Project

Summary

SCH Number
2008122067
Lead Agency
Placer County
Document Title
Lake Forest Stream Environment Zone and Wildlife Enhancement Phase of the Lake Forest Erosion Control Project Area B (SEZ and Wildlife Phase)
Document Type
NOD - Notice of Determination
Received
Posted
12/31/2013
Document Description
The CA Dept. of Fish and Wildlife is executing Lake or Streambed Alteration Agreement number 1600-2013-0128-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Placer County Department of Public Works The project consists of erosion control, water quality improvements, and the restoration of stream reaches that have been degraded by human activity. The project consists of a total of two stream reaches that will be restored, including the construction of new channels west of Bristlecone Street and in Skylandia Park. Except where precluded by adjacent infrastructure and buildings, constructed stream channels will consist of non-rigid margins. Stream banks will be constructed using biodegradable erosion control materials and long-term stability will be provided by new riparian vegetation.

Contact Information

Name
Patrick Moeszinger
Agency Name
CA Dept.of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Counties
Placer
Cross Streets
Multiple
Zip
96145
Parcel #
Multiple
State Highways
SR-28
Railways
No
Airports
No
Schools
North Tahoe HS
Waterways
Lake Forest and Polaris Creeks and Lake Tahoe
Township
16N
Range
17E
Section
32,4,5
Base
MDB&M
Other Location Info
City/Nearest Community: Tahoe City
Other Information
Twsh: 15N

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print