Chess Hatch Office Development (Phase 1)

3 Documents in Project

Summary

SCH Number
2008122065
Lead Agency
Foster City (City of Foster City)
Document Title
Chess Hatch Office Development (Phase 1)
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed Chess Hatch Office Development (Phase 1) project (Chess Hatch Phase 1 project) is the first phase of buildings proposed for construction as part of the Chess Hatch General Development Plan, approved by the City Council on September 3, 2013. The Chess Hatch Phase 1 project includes demolition of 146,000 square feet of commercial/industrial uses in nine (9) buildings and replacement with 600,000 square feet of office, biotechnology, or research and development use, and 5,000 square feet of office uses. Tower B on the east side of the office complex is proposed to be 12 stories (187 feet), containing 305,000 square feet of office uses. The connector building is proposed as one story (29 feet) with a rooftop plaza. Garage A on the west side of the property is proposed as a 5-story structure (46 feet) and provides 978 parking spaces, including 20 accessible spaces. Garage B on the east side of the property is proposed as a 7-story structure (66 feet) and provides 1,028 parking spaces, including 21 accessible spaces. Vehicular access to the property would be from Chess Drive.

Contact Information
Curtis Banks
Foster City
610 Foster City Blvd.
Foster City, CA 94404

650-286-3225

Location

Coordinates
37°33'56"N 122°16'17"W
Cities
Foster City
Counties
San Mateo
Cross Streets
Chess Drive / Hatch Drive / Foster City Boulevard
Zip
94404
Total Acres
11.89
Parcel #
094-010-500, -510, -100
State Highways
92
Schools
Audubon ES, Brewer Island ES,Bowditch MS,Foster City ES
Waterways
San Francisco Bay

Notice of Determination

Approving Agency
City of Foster City
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Community Development Department, City Hall, 610 Foster City Boulevard, Foster City, CA 94404.

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search