Chess Hatch Office Development (Phase 1)
3 Documents in Project
Summary
SCH Number
2008122065
Lead Agency
City of Foster City
Document Title
Chess Hatch Office Development (Phase 1)
Document Type
NOD - Notice of Determination
Received
Posted
4/21/2014
Present Land Use
Commercial-industrial/ Light Industrial-Planned Development/ Light Industrial
Document Description
The proposed Chess Hatch Office Development (Phase 1) project (Chess Hatch Phase 1 project) is the first phase of buildings proposed for construction as part of the Chess Hatch General Development Plan, approved by the City Council on September 3, 2013. The Chess Hatch Phase 1 project includes demolition of 146,000 square feet of commercial/industrial uses in nine (9) buildings and replacement with 600,000 square feet of office, biotechnology, or research and development use, and 5,000 square feet of office uses. Tower B on the east side of the office complex is proposed to be 12 stories (187 feet), containing 305,000 square feet of office uses. The connector building is proposed as one story (29 feet) with a rooftop plaza.
Garage A on the west side of the property is proposed as a 5-story structure (46 feet) and provides 978 parking spaces, including 20 accessible spaces. Garage B on the east side of the property is proposed as a 7-story structure (66 feet) and provides 1,028 parking spaces, including 21 accessible spaces. Vehicular access to the property would be from Chess Drive.
Contact Information
Name
Curtis Banks
Agency Name
Foster City
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Foster City
Counties
San Mateo
Cross Streets
Chess Drive / Hatch Drive / Foster City Boulevard
Zip
94404
Total Acres
11.89
Parcel #
094-010-500, -510, -100
State Highways
92
Schools
Audubon ES, Brewer Island ES,Bowditch MS,Foster City ES
Waterways
San Francisco Bay
Notice of Determination
Approving Agency
City of Foster City
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.