Manabe Ow Slough Crossing Bridge

6 Documents in Project

Summary

SCH Number
2008122060
Lead Agency
City of Watsonville
Document Title
Manabe Ow Slough Crossing Bridge
Document Type
NOD - Notice of Determination
Received
Posted
7/28/2015
Present Land Use
PLU: farmed GP: Industrial, Residential Medium density Z: Industrial park Specific Plan required
Document Description
The project is limited to the construction of the Manabe-Ow Slough Crossing Bridge, a permanent bridge, and a second temporary flat car bridge to be removed when construction activities have ceased. The permanent bridge will be constructed of concrete and will 46 ft in width and 100 ft in length. Both bridges will be constructed above the Ordinary High Water Mark. The temporary bridge will be approximately 84 ft in length, and 20 ft in width and require a 12 by 4 by 18 ft excavation in the upper slough banks which will be filled with crushed concrete. Both bridges will span a portion of the restored Watsonville Slough channel in the recently completed Watsonville Slough Manabe Wetlands Restoration Project area. CDFW is executing a Lake and Streambed Alteration Agreement No. 1600-2014-0114-R3 pursuant to section 1602 of the Fish and Game Code to the project Applicant, Benjamin Ow, Ow Family Trust.

Contact Information

Name
Melissa Farinha
Agency Name
CDFW Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
Watsonville
Counties
Santa Cruz
Cross Streets
Ontario Parkway
Zip
95076
Total Acres
~95
Parcel #
018-711,2,3,4,5,17,18,19,20,21
State Highways
1, 129
Railways
Southern Pacific
Schools
Landmark ES, Pajaro Valley High
Waterways
Pajaro River, Harkins Slough

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.