Dry Creek Wastewater Treatment Plant Levee Relocation
3 Documents in Project
Summary
SCH Number
2008122054
Lead Agency
City of Roseville
Document Title
Dry Creek Wastewater Treatment Plant Levee Relocation
Document Type
NOD - Notice of Determination
Received
Posted
2/24/2009
Document Description
The CDFG is executing Lake or Streambed Alteration Agreement No. 1600-2009-0007-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, City of Roseville.
The proposed project consists of the following components: Removing portions of the existing WWTP storage pond levee adjacent to Dry Creek and constructing a new levee that is set back approximately 157 feet from the existing levee (increasing the distance between the Dry Creek channel and the levee); relocation and reconstruction of levees on the east and west sides of the existing storage ponds; removal of interior pond levees and reconfiguration of the existing four ponds into two ponds; pond grading and pond drainage piping; placement of lining in the reconfigured ponds; large pond inlet relocation; construction of slurry walls within the new levee; relocation of an existing 12-inch water line; relocation of existing utility poles and overhead utility lines; installation of monitoring wells, and landscaping and habitat restoration along the recreated 157 foot wide floodplain.
Contact Information
Name
Mark Morse
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Roseville
Counties
Placer
Cross Streets
Booth Road, Bedell Lane
Zip
95747
Total Acres
32.22
Parcel #
474-110-002, 443-080-003, 002
State Highways
I-80
Railways
Union Pacific
Airports
No
Schools
multiple
Waterways
Dry Creek, Cirby Creek
Township
10N
Range
6E
Section
9,10
Base
MDB&M
Notice of Determination
Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.