Solid Waste Transfer Station Expansion project CIP Project No. 542-54020
4 Documents in Project
Summary
SCH Number
2008122033
Lead Agency
City of Brentwood
Document Title
Solid Waste Transfer Station Expansion project CIP Project No. 542-54020
Document Type
NOD - Notice of Determination
Received
Posted
2/26/2009
Document Description
The proposed project would require revisions to an existing City of Brentwood CUP 97-2 and Contra Costa County Environmental Helath Solid Waste Facility Permit (07-AA-0053) to allow for the relocation and expansion of the existing transfer station. The expansion of the transfer station would include installation of a transfer facility building and various site improvements. The expanded facilities would include a new, fully-enclosed transfer building, a tipping pad, a parking area, a materials storage area, and a container storage area. In addition, the site would be designed to allow for a drop-off recycling area for use by the public near the facility entrance, vehicle weigh scales, and a scale house. Site circulation would be configured to enable safe and efficient access and movement around the site, and to allow unimpeded site access by emergency vehicles.
Contact Information
Name
Paul R. Eldredge
Agency Name
City of Brentwood
Contact Types
Lead/Public Agency
Phone
Location
Cities
Brentwood
Counties
Contra Costa
Zip
94513
Parcel #
018-220-003, -004
State Highways
SR-4
Railways
SPRR
Schools
Marsh Creek ES,Knightsen ES,Gehringer ES
Waterways
Marsh Creek
Township
1N
Range
3E
Section
6
Base
MDB&M
Notice of Determination
Approving Agency
City of Brentwood
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.