Heron Point Boat Launching Facility Project, Streambed Alteration Agreement No. 2010-0059-R4

3 Documents in Project

Summary

SCH Number
2008122019
Lead Agency
Stanislaus County
Document Title
Heron Point Boat Launching Facility Project, Streambed Alteration Agreement No. 2010-0059-R4
Document Type
NOD - Notice of Determination
Received

Document Description
The applicant proposes to demolish the existing eroded one-lane boat ramp. A new two lane, concrete, v-groove boat launching ramp will be constructed. A steel-framed, aluminum-decked boarding float will be installed. 672 lineal feet of rock slope protection will be installed on 0.337 acres of steep, eroding, non-vegetated shoreline, and 439 lineal ft of Armorax, bio-friendly mats, will be installed on 0.126 acres of shoreline supporting emergent wetland vegetation. A new 60,000 sf, 40 vehicle/trailer parking area will be constructed. A new two unit restroom will be constructed. A fish-cleaning station will be constructed. An electrical system and lighting will be installed. A drainage system, landscaping, and irrigation will be installed. A kiosk, Department of Boating and Waterways Project sign, and directional signs will be constructed and installed.

Contact Information
Amy Krisch
California Department of Fish and Game
Central Region 1234 East Shaw Avenue
Fresno, CA 93710

559-243-4017 x 243

Location

Coordinates
37°50'28.9"N 120°51'50.0"W
Cities
Oakdale
Counties
Stanislaus
Zip
95361
Total Acres
5
Parcel #
002-009-024
Waterways
Woodward Reservoir
Township
1S
Range
10E
Section
22
Base
MDB&M

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
Stanislaus County Dept of Public Works 1716 Morgan Rd Modesto, CA 95358

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search