Burlingame Annual Creek and Channel Maintenance Project
6 Documents in Project
Summary
SCH Number
2008122013
Lead Agency
City of Burlingame
Document Title
Burlingame Annual Creek and Channel Maintenance Project
Document Type
NOD - Notice of Determination
Received
Posted
3/22/2011
Document Description
The proposed project consists of routine maintenance of sediment removal accumulated in the concrete lined channels of El Portal Creek and two tributaries to El Portal Creek. The maintenance activities include removal of accumulated sediment, debris (such as garbage, shopping carts, etc) and non-native vegetation. A small bobcat front-end loader would be lowered into the creek channels. The CDFG is executing a Lake and Streambed Alteration Agreement Number 1600-2010-0360-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, City of Burlingame, Public Works Department.
Contact Information
Name
Suzanne DeLeon
Agency Name
California Deparment of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Burlingame
Counties
San Mateo
Cross Streets
California Drive, Carolan Ave, Rollins Road, Highway 101, Bayshore Ave
Zip
94010
Parcel #
Various
State Highways
101
Railways
Caltrain
Airports
San Francisco Airport
Schools
Burlingame High
Waterways
Mills, Sanchez, Burlingame, El Portal, and Easton Creeks
Township
4S
Range
4&5W
Base
MDB&M
Notice of Determination
Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.