Nogales Street Grade Seperation and Gale Avenue/Walnut Drive Widening Project

3 Documents in Project

Summary

SCH Number
2008121056
Lead Agency
Alameda Corridor-East Construction Authority
Document Title
Nogales Street Grade Seperation and Gale Avenue/Walnut Drive Widening Project
Document Type
NOD - Notice of Determination
Received
Posted
12/22/2009

Document Description
The project would provide a grade separation in the City of Industry at the Nogales Street crossing of the Union Pacific Railroad (UPRR) Los Angeles Subdivision tracks and widen Gale Avenue/Walnut Drive at Nogales Street. The grade separation would depress Nogales Street below the existing UPRR tracks. The Gale Avenue/Walnut Drive widening portion of the project would widen a .83 mile segment of Gale Avenue/Walnut Drive by 16 to 18 ft from its intersection with Nogales Street, creating a 4 lane road (two lanes in each direction).

Contact Information
Susan Bransen
California Transportation Commission
1120 N Street
Sacramento, CA 95814

Phone : (916) 654-4245

Location

Cities
Industry
Counties
Los Angeles
Cross Streets
Nogales Street and Gale Avenue/Walnut Drive
Zip
91748
State Highways
SR-69
Railways
UPRR Los Angeles Division
Airports
No
Schools
Various
Waterways
San Jose Creek, San Gabriel River

Notice of Determination

Approving Agency
California Transportation Commission
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
Alameda Corridor-East Construction Authority 4900 Rivergrade Road, Suite A120 Irwindale, CA 91706

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print