Nogales Street Grade Seperation and Gale Avenue/Walnut Drive Widening Project

3 Documents in Project

Summary

SCH Number
2008121056
Lead Agency
Alameda Corridor-East Construction Authority (ACE)
Document Title
Nogales Street Grade Seperation and Gale Avenue/Walnut Drive Widening Project
Document Type
NOD - Notice of Determination
Received
Posted
9/23/2009
Present Land Use
PLU: Transportation
Document Description
The Nogales Street grade separation portion of the Proposed Project includes lowering a currently at-grade segment of Nogales Street, an existing six-lane roadway, under the UPRR Los Angeles Subdivision right-of-way (ROW). A railroad bridge would be constructed to accommodate the two existing tracks plus additional abutment width to allow for a future widening to accommodate a third track. Additional roadway improvements include street construction and widening, off-site modifications, retaining walls, storm drains, a pump station, sewer utility relocations, traffic signals, street lighting, and landscaping. The temporary at-grade crossing of the UPRR tracks. A temporary two-track shoofly, approximately 3,000 feet in length, will be constructed to maintain rail operations during construction. The Gale Avenue/Walnut Drive widening portion of the Proposed Project would widen 0.83-mile segment of Gale Avenue/Walnut Drive (a 0.36-mile segment of Gale Avenue and a 0.47-mile segment of Walnut Drive) by 16 to 18 feet (8 to 9 feet on either side), from its intersection with Nogales Street, creating a four lane road (two lanes in each direction).

Contact Information

Name
Mr. Rick Richmond
Agency Name
Alameda Corridor-East Construction Authority
Contact Types
Lead/Public Agency

Location

Cities
Industry
Counties
Los Angeles
Cross Streets
Nogales Street and Gale Avenue/Walnut Drive
Zip
91748
State Highways
SR-69
Railways
UPRR Los Angeles Division
Airports
No
Schools
Various
Waterways
San Jose Creek, San Gabriel River

Notice of Determination

Approving Agency
Alameda Corridor-East Construction
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print