SR-68/San Benancio Road Intersection Improvement Project

4 Documents in Project

Summary

SCH Number
2008121039
Lead Agency
California Department of Transportation, District 5
Document Title
SR-68/San Benancio Road Intersection Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
2/11/2010
Document Description
The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement pursuant to Section 1602 of the Fish and Game Code to the Project applicant, Mr. Enrique Saavedra. The proposed Project would widen the bridge over El Toro Creek by approximately 24 feet to include two (2) new lanes. To accommodate the widened bridge, one (1) concrete abutment would be built on each side of the stream channel next to the existing abutments. Rock slope protection (RSP) would be installed to protect the abutments during high flows. On State Route 68, the highway would be widened on both sides to provide for a second-west to southbound left turn lanes. Concrete or rock-lined swales would be built to convey runoff water from the roads, and one (1) culvert may be extended with an energy dissipation pad built at the outlet. Approximately 0.50 acre and 0.15 acre of riparian habitat would be temporarily and permanently impacted, respectively, including removal of arroyo willow and coast live oak.

Contact Information

Name
Karen Bewley
Agency Name
California Department of Transportation,
Contact Types
Lead/Public Agency

Location

Cities
Monterey
Counties
Monterey
Cross Streets
SR 68 and San Benancio Rd
Total Acres
6.5
State Highways
68
Waterways
El Toro Creek
Township
16S
Range
2E
Section
6
Base
MDB&M

Notice of Determination

Approving Agency
Caltrans #5
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print