Tres Pinos Crossing, Agreement 2009-0055-R4

3 Documents in Project

Summary

SCH Number
2008121031
Lead Agency
San Benito County Water District
Document Title
Tres Pinos Crossing, Agreement 2009-0055-R4
Document Type
NOD - Notice of Determination
Received
Posted
6/30/2009
Document Description
The proposed Project would annually install and remove a prefabricated creek crossing structure to accommodate vehicular passage at the site during periods when the San Benito Water District releases water for perolation operations. The structure would be similar to a Bailey bridge in that it would measure ~14 ft wide and 60 ft long and would be constructed of prefabricated metal segments designed to fit the contour of the streambed that exists at the time of installation. The deck would be constructed to be ~3 ft above the streambed surface, leaving ~2 ft of clearance for flow. While a John Deer 510B backhoe or similar equipment would be used ti install and remove the structure itself, no grading, excavating, or otherwise installed at the site. No vegetation would be removed or trimmed to accommodate the structure. The struture would be installed no earlier than Aril 15 and removed OT 31. Upon disassembly, the structure pieces would be stored on an upper terrace out of the existing flow channel.

Contact Information

Name
Mike Hall
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
San Benito
Cross Streets
Airline Hwy (St Rt 25) and Willow Grove School Road
Zip
95043
Total Acres
0.019
Parcel #
none
State Highways
25
Railways
none
Airports
none
Schools
Willow Grove School
Waterways
Tres Pinos Creek
Township
13S
Range
7E
Section
2/11
Other Location Info
Paicines

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.