Tres Pinos Creek Crossing

3 Documents in Project

Summary

SCH Number
2008121031
Lead Agency
San Benito County Water District
Document Title
Tres Pinos Creek Crossing
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2009
Document Description
The project involves the annual erection and removal of a seasonal, low-water crossing of Tres Pinos Creek at 11599 Airline Hwy (approx. ½-mile southerly of Murphy Rd & 100-ft northerly of Willow Grove Schl. Rd), in San Benito County. The project will be undertaken yearly, to re-establish the existing crossing during District percolation operations within the Tres Pinos Creek flow channel, between June 1st and October 15th. District work forces will erect pre-fabricated structural members into a 60 ft long elevated crossing that will have a 2 ft minimum of freeboard, 3 to 4 spread-footing/at-surface piers, and 4 to 5 10 ft span deck members. Heavy lifting equipment will be utilized to move pre-fabricated structural members into and out of the dry stream channel during installtion and removal activities. Neither consrete nor earthwork will be involved in the corssing construction. The width of the crossing will b e14 ft. Upon completion of District percolation operationes within the Tres Pinos Creek, no later than October 15th of each season, District work forces will disassemble all members, and store them on an uppert terrace, above the current flow channel.

Contact Information

Name
Jeff Cattaneo
Agency Name
San Benito County Water District
Contact Types
Lead/Public Agency

Location

Counties
San Benito
Cross Streets
Airline Hwy (St Rt 25) and Willow Grove School Road
Zip
95043
Total Acres
0.019
Parcel #
none
State Highways
25
Railways
none
Airports
none
Schools
Willow Grove School
Waterways
Tres Pinos Creek
Township
13S
Range
7E
Section
2/11
Other Location Info
Paicines

Notice of Determination

Approving Agency
San Benito County Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A