Trabuco Road Streetscape Project
4 Documents in Project
Summary
SCH Number
2008121017
Lead Agency
City of Lake Forest
Document Title
Trabuco Road Streetscape Project
Document Type
NOD - Notice of Determination
Received
Posted
7/27/2009
Present Land Use
Project is located within the public right-of-way of Trabuco Road. Zoning and General Plan designations to not apply to roadways.
Document Description
Trabuco Road is a vital commuter link that serves the cities of Irvine, Lake Forest, and Mission Viejo. It is designated 6-lane divided major highway in the City's General Plan and the County of Orange Master Plan of Arterial Highways. The project will construct about 4,500' of raised landscaped median, the missing 2,000' portion of the 6th lane and 2,800' sidewalk along the west side, parkway landscaping on both sides, and screen and sound walls along the west side. In addition, two existing signals will be modified and a new signal will be constructed. Also, a storm drain will be extended at one location to accommodate the widening.
Contact Information
Name
Theodore Simon
Agency Name
City of Lake Forest
Contact Types
Lead/Public Agency
Phone
Location
Counties
Orange
Cross Streets
Trabuco Road between Bake Parkway and Lake Forest Drive
Zip
92630
State Highways
None
Railways
BNSF/Amtrak (LOSSAN Corridor)
Airports
None
Schools
El Toro HS, Serrano IS, Olivewood ES, Lake Forest ES, Santiago E
Waterways
Serrano Creek, Aliso Creekq
Other Location Info
City of Lake Forest
Other Information
ES, La Madera ES
Notice of Determination
Approving Agency
City of Lake Forest
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.