California Highway Patrol Oceanside Replacement Office Project

2 Documents in Project

Summary

SCH Number
2008121016
Lead Agency
Department of General Services (DGS)
Document Title
California Highway Patrol Oceanside Replacement Office Project
Document Type
NOD - Notice of Determination
Received
Posted
1/22/2009
Document Description
The purpose of the Project is to continue to provide high-level patrol and law enforcement services to the City of Oceanside and surrounding areas while meeting the expanding needs of the CHP. The Project would include the acquisition of a 2.2 acre plot of land for the purpose of constructing and operating a new LEED-certified (Silver) two-story, 21,710 square feet office building. In addition to the office building, a one-story automobile servide building, along with a generator, radio equipment, and volatile equipment building, would be located on teh southwest corner of the construction boundary. The automobile service building would be designed without openings on the western side to limit noise levels on the adjacent residential land use. A seperate canopied facility would be constructed on the western portion of the Project site directly west of the office building. a 120 ft communication tower would be constructed directly east of the equipment storage facility. A total of 117 surface parking spaces, including 2 handicap spaces, 16 motorcycle parking spaces, and 68 CHP parking spaces, would be constructed at the Project site. Site work would generally involve grubbing, clearingm grading, and paving, utilizing both heavy-and light-duty equipment. A retainingwall reaching up to 28 ft in height in certain areas would be constructed to support the development along the northern slope. The Project would connect to water, wastewater, electrical, telephone, and gas lines in the Public Right-of-Way on La Tortuga. Construction is estimated to last between 12 and 18 months.

Contact Information

Name
Lynne Rodrian
Agency Name
Department of General Services
Contact Types
Lead/Public Agency

Location

Cities
Vista
Counties
San Diego
Cross Streets
La Tortuga Drive between the intersections of Hacienda Drive and Breeze Hill Road
Zip
92081
Total Acres
2.2
Parcel #
166-150-74
State Highways
78
Railways
none
Airports
none
Schools
none
Waterways
none

Notice of Determination

Approving Agency
California Highway Patrol
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print