Concurrence in the Issuance of a Revised Solid Waste Facilities Permit for Lamb Canyon Sanitary Landfill in Riverside County, SWIS No. 33-AA-007

8 Documents in Project

Summary

SCH Number
2008121005
Lead Agency
Riverside County
Document Title
Concurrence in the Issuance of a Revised Solid Waste Facilities Permit for Lamb Canyon Sanitary Landfill in Riverside County, SWIS No. 33-AA-007
Document Type
NOD - Notice of Determination
Received
Posted
5/16/2016
Document Description
Proposed changes include: Revise the hours fot eh receipt of waste from 4:00 a.m. to 9:00 p.m. Monday-Sunday; Revise the permitted tonnage from 5,000 tons per day (tpd) to 5,000 tpd plus 500 tpd for beneficial reuse; Increase the maximum elevation from 2,410 feet mean sea level (msl) to 2,460 msl, including grading plan modifications; Correct the maximum depth form 300 feet msl to 350 feet below ground surface; Increase the total design capacity from 33,041,000 cubic yards to 38,936,653 cubic yards; Accept non-hazardous dewatered sewage and waste water treatment sludge and non-hazardous asbestos containing waste for disposal; Recirculate leachate, gas condensate, and stormwater runoff in lined areas; and update the estimated closure date from 2021 to 2029.

Contact Information

Name
Megan Emslander
Agency Name
CalRecycle
Contact Types
Lead/Public Agency

Location

Cities
Beaumont, San Jacinto
Counties
Riverside
Cross Streets
Gilman Springs Road
Zip
92223
Total Acres
1,184.5
Parcel #
421-170-034; 421-200-023, -024, -033, -043; 421-190-016, 421-220-014, -023, -024, -025, -026;
State Highways
79
Township
3S
Range
2W
Base
SBBM
Other Information
Parcel No Con.: 421-230-008, -009 Sections: 21, 28, 29

Notice of Determination

Approving Agency
CalRecycle
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A