Revision to Lamb Canyon Landfill Solid Waste Facility Permit (SWFP) No. 33-AA-0007 and Joint Technical Document (JTD) No. 18
8 Documents in Project
Summary
SCH Number
2008121005
Lead Agency
Riverside County
Document Title
Revision to Lamb Canyon Landfill Solid Waste Facility Permit (SWFP) No. 33-AA-0007 and Joint Technical Document (JTD) No. 18
Document Type
NOD - Notice of Determination
Received
Posted
1/27/2016
Document Description
The proposed project revises Lamb Canyon Landfill SWFP 33-AA-0007, to include the following landfill operational and administrative modifications, as identified in JTD No. 18; 1) add waste disposal on all Sundays, as needed; 2) accept State-regulated non-hazardous asbestos-containing waste (ACW) for disposal; 3) accept non-hazardous sludge for disposal, 4) grading plan modifications that incorporate the recently constructed stability berm to add approximately 5.6 million cubic yards of disposal airspace, extend the estimated closure date to 2029, and raise the final landfill elevation by approximately 50 ft from approximately 2,410 ft above mean sea level to 2,460 ft MSL; 5) implement alternative methods to recirculate landfill leachate and gas condensate, and 6) construct two evaporation ponds northwest of the existing Waste Recycling Park.
Contact Information
Name
Ryan Ross
Agency Name
Riverside County
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Beaumont, San Jacinto
Counties
Riverside
Cross Streets
Gilman Springs Road
Zip
92223
Total Acres
1,184.5
Parcel #
421-170-034; 421-200-023, -024, -033, -043; 421-190-016, 421-220-014, -023, -024, -025, -026;
State Highways
79
Township
3S
Range
2W
Base
SBBM
Other Information
Parcel No Con.: 421-230-008, -009
Sections: 21, 28, 29
Notice of Determination
Approving Agency
Riverside County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.