O'Brian Annexation, General Plan Amendment and Prezone and City of Roseville/Public Homes General Plan Amendment, Rezone and Lot Line Adjustments

2 Documents in Project

Summary

SCH Number
2008112108
Lead Agency
City of Roseville
Document Title
O'Brian Annexation, General Plan Amendment and Prezone and City of Roseville/Public Homes General Plan Amendment, Rezone and Lot Line Adjustments
Document Type
NOD - Notice of Determination
Received
Posted
2/2/2009
Document Description
Phase 1: The applicant, the City of Roseville Planning and Redevelopment Department, requests approval of an Annexation of two City owned parcels totaling 10.06+ac into the City of Roseville, a General Plan Amendment from Agriculture/Timberland 80 ac to Commercial and industrial; and a Pre-zone from F-B-X 80 ac. minimum to General Commercial and Light Industrial. Phase 2: After annexation the City proposes to process a lot line adjustment with the adjacent property to the west owned by PL Roseville (Pulte). Currently the City's parcels and Pulte's parcel are long and narrow making access and site design on both properties challenging. Pulte has agreed to adjust the property lines so that Pulte and the City will have resulting parcels with better visibility, better access and more design flexibility. The lot line adjustment with Pulte will also include a GPA and Rezone of the Pulte property so that the resultant lots will have appropriate zoning to accommodate a future animal shelter and a more viable commercial parcel on the corner of future Blue Oaks Blvd. and West Side Dr.

Contact Information

Name
Laura Conti
Agency Name
City of Roseville
Contact Types
Lead/Public Agency

Location

Cities
Roseville
Counties
Placer
Cross Streets
Phillip Road
Zip
95747
Total Acres
10.06
Parcel #
017-100-028-510, -017 ; 100-027-510
State Highways
No
Railways
No
Airports
No
Schools
Chilton Middle, Junction ES
Waterways
Pleasant Grove Creek
Township
11
Range
5E
Section
23

Notice of Determination

Approving Agency
City of Roseville
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print