Sycamore Crossing Project (Streambed Alteration Agreement No. EPIMS-CCA-29022-R3)

4 Documents in Project

Summary

SCH Number
2008112049
Lead Agency
City of Hercules
Document Title
Sycamore Crossing Project (Streambed Alteration Agreement No. EPIMS-CCA-29022-R3)
Document Type
NOD - Notice of Determination
Received
Posted
2/7/2023
Document Description
The project is limited to the construction of a 110-foot-long by five-foot-tall concrete retaining wall, and a new 0.459-acre detention basin with an associated rock riprap spillway that outfalls into Ohlone Creek. Construction will require tree removal and excavation within the channel. Excavated, regraded, and disturbed areas susceptible to erosion will be stabilized with biodegradable erosion control features, hydroseeding, and native tree and shrub replanting. Permanent impacts caused by the project will be mitigated for through an offsite mitigation bank credit purchase.

Contact Information

Name
Andrew Chambers
Agency Name
CDFW
Job Title
Environmental Scientist
Contact Types
Responsible Agency

Location

Cities
Hercules
Counties
Contra Costa
Regions
Northern California, San Francisco Bay Area
Other Location Info
The project is located on Ohlone Creek, in the County of Contra Costa, State of California; Latitude 38.012794, Longitude -122.276124; Assessor’s Parcel Number 404-020-095-0.

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Contra Costa
Final Environmental Document Available at
2825 Cordelia Road, Suite 100 Fairfield, CA 94534

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613. For more information, please visit OPR’s Accessibility Site.

Download CSV New Search Print