Cedar Boulevard Sanitary Sewer Rehabilitation Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-5220-110
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008112044
- Lead Agency
- Union Sanitary District
- Document Title
- Cedar Boulevard Sanitary Sewer Rehabilitation Project (Project); Clean Water State Revolving Fund (CWSRF) No. C-06-5220-110
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/8/2009
- Document Description
- The Project will rehabilitate the failing sewer pipelines. The Project consists of rehabilitating approximately 7,000 linear feet of existing 27-inch diameter and 1,184 linear feet of 30-inch diameter reinforced concrete pipe. The Project will use the cured-in-place pipe method and include a temporary bypass system that diverts the existing sewer flow around the section of pipe being rehabilitated. The Project will also include manhole restoration activities.
- Contact Information
-
Michelle L. Jones
State Water Resources Control Board
Lead/Public Agency
Division of Financial Assistance 1001 I Street, 16th Floor
Sacramento, CA 95814
Phone : (916) 341-6983
Location
- Cities
- Newark
- Counties
- Alameda
- Cross Streets
- Newark Blvd., Haley St., Willow St.
- Zip
- 94560
- State Highways
- 84/880
- Railways
- UPRR
- Schools
- Kennedy, Whiteford, Musick, St. Edwards, Newark, Milani, Graham
- Waterways
- Newark Slough, Plummer Creek
- Township
- 4/5S
- Range
- 2W
- Section
- 2,35
- Other Information
- Schools: Snow, Lincoln, Schilling
Notice of Determination
- Approving Agency
- State Water Resources Control Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- SWRCB 1001 I Street, 16th Floor Sacramento, CA 95814
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- N/A
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.