Joshua Basin Water District Recharge Basin and Pipeline Project

5 Documents in Project

Summary

SCH Number
2008111082
Lead Agency
Joshua Basin Water District
Document Title
Joshua Basin Water District Recharge Basin and Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
10/5/2009
Document Description
JBWD proposes to construct one recharge basin facility that would be ~20 to 35 acres in size, and an extension of the Morongo Basin Pipeline from its existing terminus on Yucca Mesa Road to the new basin (proposed project). The project would involve construction of multiple (up to 6) 6 to 7 ft deep subbasins within the recharge basin. Subbasins would be seperated by overflow earthen weirs, allowing water to flow from subbasin to subbasin as needed. The proposed pipeline would include up to 24,000 linear ft of 16-24 inch diameter pipe connecting to the existing Morongo Pipeline at Yucca Mesa Road. The pipeline would be constructed within existing roadway rights-of-way. Annual average recharge is anticiapted to be up to 2,000 acre ft per yr of State Water Project water depending on availability.

Contact Information

Name
Joe Guzzetta
Agency Name
Joshua Basin Water District
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino
Cross Streets
Highway 62 at Joshua Tree
Zip
92252
Parcel #
060123115,060123114,060319141,060122129
State Highways
SR 62
Airports
No
Schools
Joshua Tree ES, Friendly Hills ES
Waterways
Joshua Creek, Yucca Creek
Township
1N
Range
6E
Other Location Info
City/Nearest Community: Joshua Tree

Notice of Determination

Approving Agency
Joshua Basin Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print