Campus Photovoltaic Energy Project

3 Documents in Project

Summary

SCH Number
2008111071
Lead Agency
California State University, Pomona (CPP)
Document Title
Campus Photovoltaic Energy Project
Document Type
NOD - Notice of Determination
Received
Posted
10/30/2009
Present Land Use
Various campus facilities/Campus Master Plan
Document Description
The project consists of retrofitting various facilities within the California State Polytechnic University, Pomona with photovoltaic (PV), i.e. solar, panels that will provide approximately five megawatts (mW) of electricity to the campus. The solar utility provider will design, install, and operate the panels and sell the power generated by the panels back to the campus for a period of 20 years. All fo the panels will be installed on the roofs of campus buildings or canopied on top of parking lots. The proposed retrofit is part of the University's ongoing intiative to create a more sustainable campus environment, which includes numerous alternative energy projects with a particular emphasis on developing an extensive PV system.

Contact Information

Name
George Lwin
Agency Name
California Polytechnical University, Pomona
Contact Types
Lead/Public Agency

Location

Cities
Pomona
Counties
Los Angeles
Cross Streets
Cal Poly Ponoma campus-generally bounded by West Temple Avenue and Valley Blvd
Zip
91768
Total Acres
1384
Parcel #
various
State Highways
I-10, SR-71 & SR-57
Railways
No
Airports
No
Schools
Various
Waterways
No

Notice of Determination

Approving Agency
Califonria State Polytechnic University, Pomona
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print