Remedial Action Plan, Proposed South REgion High Schol No 12-Site 1

2 Documents in Project

Summary

SCH Number
2008111069
Lead Agency
Department of Toxic Substances Control
Document Title
Remedial Action Plan, Proposed South REgion High Schol No 12-Site 1
Document Type
NOD - Notice of Determination
Received
Posted
2/9/2009
Document Description
The project involves approval of a Remedial Action Plan (RAP) by the Department of Toxic Substances Control for the proposed South Region High School #12, Site 1 pursuant to Health and Safety Code chapter 6.8. The RAP focuses on (1) excavation and off-site disposal of onsite shallow soils impacted with metals and total petroleum hydrocarbons; (2) a combination of excavation and off-site disposal, installation and operation of a soil vapor extraction system (SVE), for deeper soils impacted with volatile organic compunds (VOCs); and (3) in situ shemical oxidation of groundwater impacted with chlorinated VOCs. An approved Operations, Monitoring, and Maintenance Plan will be conducted after the Site is backfilled, SVE is initiated and in Situ Chemical Oxidation is completed. The OMMP may consist of soil gas and groundwater monitoring wells requiring long term monitoring. The RAP is incorporated by reference.

Contact Information

Name
Amit Pathak
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
East 87th Place and Avalon Blvd.
Parcel #
6041-020-001 thru -010; -604
State Highways
110, 105
Schools
Several
Waterways
Compton Creek
Township
2S
Range
13W
Section
32

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print