Los Angeles State Historic Park Master Development Plan Phase I Implementation

4 Documents in Project

Summary

SCH Number
2008111064
Lead Agency
Parks and Recreation, Department of (California Department of Parks and Recreation)
Document Title
Los Angeles State Historic Park Master Development Plan Phase I Implementation
Document Type
NOD - Notice of Determination
Received

Document Description
The proposed project would include: three event spaces; one-story Welcome Station and operations buildings; a 14-foot-tall elevated walkway including the Roundhouse Observation Deck, which would rise above exposed archaeological features; hardscaped walkways and/or plazas; jogging and interpretive trail loops, a Children's Interpretive Play Area/Exploration Zone and a "Storytelling Circle" amphitheater; unstructured play, work-out, and group gathering areas; up to two approx. 75-parking space surface lots; new pedestrian pathway, parking lot and security lighting; bioswales, constructed/demonstration wetlands, and a habitat area; new trees, landscaping, and turf areas; fire access and services road(s); and new automated irrigation systems.

Contact Information
Luke Serna
California Department of Parks and Recreation
8885 Rio San Diego Drive Suite 270
San Diego, CA 92108

619 688 6492
enviro@parks.ca.gov

Location

Coordinates
34°4'8.07"N 118°13'51.2"W
Cities
Los Angeles, City of Los Angeles
Counties
Los Angeles
Cross Streets
Spring and Baker Streets
Zip
90012
Total Acres
32
Parcel #
5414016903
State Highways
Hwy 110
Railways
Metro Gold Line
Schools
Ann Street School
Waterways
Los Angeles River

Notice of Determination

Approving Agency
California Department of Parks and Recreation
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
Department of Parks and Recreation 1416 Ninth Street P.O. Box 942896 Sacramento, California 94296-0001

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search