Mitigated Negative Decalration for the Pipelines 3 and 4 Relining Project-Miramar Hill to State Route 52 for the San Diego County Water Authority

2 Documents in Project

Summary

SCH Number
2008111059
Lead Agency
San Diego County Water Authority
Document Title
Mitigated Negative Decalration for the Pipelines 3 and 4 Relining Project-Miramar Hill to State Route 52 for the San Diego County Water Authority
Document Type
NOD - Notice of Determination
Received
Posted
4/9/2009
Document Description
The proposed project consists of the rehabilitation of approximately 44,000 linear feet of existing pipeline with steel liners and install several appurtenant features along the pipeline alignments. The project woul strengthen and rehabilitate deteriorating infrastructure and increse the reliability of water transport in the region, facilitating the safe and efficient delivery of untreated water to the Water Authority's member agencies. The project includes: relining adjacent segments of existing prestressed concrete cylinder pipe within Pipelines 3 and 4, installation of inline bulkheads, construction of a new connection between Pipelines 3 and 4, replacement of an existing drain valve and installation of new polyvinylchloride pipe, and installation of cathodic station testing wires at numerous locations throughout both pipeline segments.

Contact Information

Name
Mark V. Tegio
Agency Name
San Diego County Water Authority
Contact Types
Lead/Public Agency

Location

Cities
San Diego
Counties
San Diego
Cross Streets
Hawkeye Way/Spitfire Road to Portobello Drive/Camino Playa Baja
Zip
92129-24
Total Acres
44,000
Parcel #
3185211400 to 3730718400
State Highways
I-15, SR 52, SR 163
Airports
MCAS Miramar
Schools
Thurgood Marshall, AIU
Waterways
San Diego River
Township
14S
Range
2W
Section
mult
Base
SBB&M
Other Location Info
City/Nearest Community: Mira Mesa, Scripps Ranch
Other Information
Twnshp: 15S

Notice of Determination

Approving Agency
San Diego County Water Authority
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print