PPG Industries, Inc. (PPG) Draft Removal Action Workplan (Draft RAW)

2 Documents in Project

Summary

SCH Number
2008111058
Lead Agency
Department of Toxic Substances Control
Document Title
PPG Industries, Inc. (PPG) Draft Removal Action Workplan (Draft RAW)
Document Type
NOD - Notice of Determination
Received
Posted
12/23/2008
Present Land Use
M1, M2, C2 and R1
Document Description
The proposed project is the Dept. of Toxic Substances Control's (DTSC) approval of implementation of limited soil removal in five areas on the PPG Site. The site contains 14 5-acres of real property formerly operated by PPG. The PPG manufacturing plant, constructed in 1950, operated from 1950 to 2000. The DTSC and its predecessor agency, the Dept. of Health Services (DHS), approved closure certification for all former hazardous waste units at the Site: 1 container storage area and 2 above ground hazardous waste storage tanks in 1996 and 1 thermal oxidizer in 1987. Manufacturing operations were scaled down in 1999 in preparation for closure and demolition of the facility. The Draft RAW, PPG site, dated Oct. 2008 is incorporated by reference.

Contact Information

Name
Johnson P. Abraham
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Torrance
Counties
Los Angeles
Cross Streets
465 Crenshaw Blvd. (Crenshaw & 208th St)
Zip
90509
Total Acres
14.5
Parcel #
7352-002-008 & -010
State Highways
405, 110
Railways
BNSF
Airports
Torrance
Schools
Fern ES
Waterways
Dominguez Channel
Township
4S
Range
14W
Base
LA

Notice of Determination

Approving Agency
Department of Toxic Substances Control
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.