Burbank Recycled Water System Expansion Project
4 Documents in Project
Summary
SCH Number
2008111017
Lead Agency
City of Burbank
Document Title
Burbank Recycled Water System Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
12/24/2008
Present Land Use
residential, commercial, public, amd recreational.
Document Description
The project will expand the existing recycled water ystem as outlined in the 2007 Recycled Water Master Plan (RWMP). Expansion of the recycled water system will result in increased recycled water deliveries of over 900 acre-ft/yr. The individual expansion areas are identified as the Vallhalla, Studio District, Northeastern Burbank Area, Wildwood Canyon, Los Angeles Equestrian Center Extension, and Nothern Burbank Extensions. The proposed pipeline extensions total approximately 89, 500 linear feet, ranging in size from 6 to 12 inches in diameter. Two new pump stations are required for the expansion, which will be located at Foy Park and Wildwood Canyon Park.
Contact Information
Name
Matt Elsner
Agency Name
City of Burbank
Contact Types
Lead/Public Agency
Phone
Location
Cities
Burbank
Counties
Los Angeles
Cross Streets
various roadways within the City of Burbank
Zip
91502
State Highways
5
Railways
Metrolink
Schools
Various public school campuses along proposed alignments
Waterways
Wildwood Canyon
Notice of Determination
Approving Agency
City of Burbank
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.