Middle School No. 8.75

2 Documents in Project

Summary

SCH Number
2008111011
Lead Agency
Fontana Unified School District
Document Title
Middle School No. 8.75
Document Type
NOD - Notice of Determination
Received
Posted
12/15/2008
Present Land Use
Public Facilities and Residential Planned Community
Document Description
Develop and operate a 1,350-seat initial capacity middle school with the potential to grow to a master planned capacity of 1,620-seat. The campus would be constructed in an "all-under-one-roof" concept (approximately 130,438 sf), inclusive of classrooms, gymnasium, library, and administration building spaces covered under the one roofline with the exception of the multipurpose building and portable classroom buildings. The main building would house 49 permanent classrooms and, if growth requires, 11 portable classrooms would be placed north of the main structure, for a master planned capacity of 60 classrooms. Recreational facilities would be included with no nighttime lighting initially and two detention totaling approx. 1.75 acres. The second would be accessed from Walnut Ave. and Almeria Ave. and two parking lots would provide a total of 250 parking spaces.

Contact Information

Name
Melinda Pure
Agency Name
Fontana Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Fontana
Counties
San Bernardino
Cross Streets
Almeria and Highland
Total Acres
32.6
Parcel #
various
State Highways
SR-210
Railways
no
Airports
no
Waterways
no
Township
1N
Range
6W
Section
36
Base
SBB&M

Notice of Determination

Approving Agency
Fontana Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print