State Route 39 North Fork San Gabriel River Bridge Scour Migation/Seismic Retrofit Project

7 Documents in Project

Summary

SCH Number
2008111010
Lead Agency
California Department of Transportation, District 7
Document Title
State Route 39 North Fork San Gabriel River Bridge Scour Migation/Seismic Retrofit Project
Document Type
NOD - Notice of Determination
Received
Posted
3/24/2016
Document Description
California Department of Transportation (Caltrans) proposes to replace the San Gabriel River Bridge #53-2245 (bridge) on SR 39 /PM 31.2. The project consists of two phases. The first phase consists of realigning the road approach and departure for the new bridge. The second phase will consist of constructing a new bridge open-span bridge, and demolishing the existing bridge structure. The existing bridge is described as a continuous 3 span Girder Bridge. Additionally, the existing bridge has two single column piers and open-end abutments on double column bents. The south abutment was installed using spread footing. The north abutments and column piers are supported on driven steel piles. The third pier is located inside the active channel of the North Fork San Gabriel River.

Contact Information

Name
Jamie Jackson
Agency Name
California Transportation Commission
Contact Types
Lead/Public Agency

Location

Cities
Azusa
Counties
Los Angeles
State Highways
39
Waterways
San Gabriel River and tributaries

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print