Walerga Road Bridge Replacement Utility Pole Relocation Project (Streambed Alteration Agreement No. 1600-2017-0033-R2)

7 Documents in Project

Summary

SCH Number
2008102100
Lead Agency
Placer County
Document Title
Walerga Road Bridge Replacement Utility Pole Relocation Project (Streambed Alteration Agreement No. 1600-2017-0033-R2)
Document Type
NOD - Notice of Determination
Received
Posted
4/24/2017
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 160-2017-0033-R2, pursuant to section 1602 of the Fish and Game Code to the Placer County Department of Public Works (Permittee), as represented by Kellenn Prindiville. Project is limited to the relocation of utility poles and overhead lines. Overhead utility facilities currently run north/south on the east side of Walerga Road. The overhead facilities within the project limits consist of electric lines (SMUD), and telecommunication/fiber optic/cable lines (Spring, XO Communications, CCI, and Comcast). The overhead relocation work will consist of SMUD installing new utility poles further east from the existing poles. Within riparian zone, the new poles will be placed approx. 170 feet east of the existing Walerga Road Bridge. After SMUD installs the new utility poles, they will relocate their overhead lines onto the new poles. The other utility owners will then relocate their overhead facilities onto the new SMUD poles. The final step will involve the removal of the existing poles.

Contact Information

Name
Angela Calderaro
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Roseville
Counties
Placer
Cross Streets
Walerga Road between Baseline Road and PFE Road
Zip
95747
Parcel #
023-221-052-000
Railways
Union Pacific
Schools
Dry Creek Elementary
Waterways
Dry Creek
Township
10N
Range
6E
Section
7
Base
MDB & M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print