Lake or Streambed Alteration Agreement No. 1600-2011-0079-R1, Navarro Bluff Retreat Road Realignment/Culvert Replacement on SR 1, Unnamed Tributaries to the Pac
4 Documents in Project
Summary
SCH Number
2008102096
Lead Agency
California Department of Transportation, Headquarters
Document Title
Lake or Streambed Alteration Agreement No. 1600-2011-0079-R1, Navarro Bluff Retreat Road Realignment/Culvert Replacement on SR 1, Unnamed Tributaries to the Pac
Document Type
NOD - Notice of Determination
Received
Posted
6/27/2011
Document Description
The DFG is issuing an Agreement pertaining two encroachments: realign roadway, remove and install new culverts, restore existing drainages, decommission old roadway install rock slope protection at culvert outlets on SR 1 at PM 38.65 and 38.72. Project will have short-term and permanent impacts to wetland habitats. One small grand fir will be removed. Short-term and permanent wetland habitats will have mitigation at ratios of 1:1 and 3:1 respectfully.
Contact Information
Name
Rick Macedo
Agency Name
DFG Northern Region
Contact Types
Lead/Public Agency
Phone
Location
Counties
Mendocino
Zip
95432
Total Acres
155.6688
Parcel #
126-150-02-00
State Highways
Hwy 1
Waterways
Navarro River, Pacific Ocean
Other Location Info
Albion
Notice of Determination
Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.