Wildcat Creek Restoration Project through Tilden Park Golf Course

7 Documents in Project

Summary

SCH Number
2008102093
Lead Agency
East Bay Regional Parks District
Document Title
Wildcat Creek Restoration Project through Tilden Park Golf Course
Document Type
NOD - Notice of Determination
Received

Document Description
The project encompasses 900 linear feet of Wildcat Creek within the Tilden Golf Course. The project is limited to restoration activities within Wildcat Creek to stabilize and enhance habitat into a system of steps and pools. Three permanent engineered steps will be placed at the downstream point of the project reach and below each of two existing headcuts. The project will also add a limited amount of sediment and rock to supplement and natural sediment, allowing for continued self-organization of the channel substrate into stable steps and pools. A channel will be created through the backwater areas of the downstream sediment basin to create a more natural channel and floodplain configuration. Minor grading (200 feet of grading along a 500-foot reach) will be done to stabilize the banks. Native plants will be installed along the length of the project. The California Department of Fish and Game is executing Lake and Streambed Alteration Agreement Number 1600-2012-0002-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, East Bay Regional Park District.

Contact Information
Randi Adair
California Department of Fish and Game
Bay Delta Region 7329 Silverado Trail
Napa, CA 94558

707-944-5596

Location

Cities
San Ramon
Counties
Contra Costa Alameda

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
2950 Peralta Oaks Court, Oakland, CA 94605

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A Statement of Overriding Considerations was adopted for this project
N/A
(5) Findings were made pursuant to the provisions of CEQA
N/A
Download CSV New Search