Las Trampas Creek FEMA Landslide Repair Project

7 Documents in Project

Summary

SCH Number
2008102093
Lead Agency
East Bay Regional Parks District
Document Title
Las Trampas Creek FEMA Landslide Repair Project
Document Type
NOD - Notice of Determination
Received
Posted
6/3/2011
Document Description
DFG is executing Lake and Streambed Alteration Agreement Number 1600-2011-0130-3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, East Bay Regional Park District, for repair of a 40-foot by 40-foot bank landslide below an existing fire trail. The proposed slide repair includes removal of loose soil and debris (including vegetation and asphaltic concrete), installation of filter fabric, excavation of an anchor trench and crib walls, recontouring of the banks, and installation of a riprap apron around an existing storm drain outlet. The project is located at Las Trampas Creek, in the County of Contra Costa, State of CA; Latitude 37.891206 N, Longitude 122.112147 W; near the corner of Moraga Boulevard and Third Street in the City of Lafayette. The streambank repair location is on the northwest bank of Las Trampas Creek, approximately 40 feet downstream from the Moraga Road overpass.

Contact Information

Name
Randi Adair
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
San Ramon
Counties
Alameda, Contra Costa

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print