Cache Creek North Levee Setback Project - Critical Erosion Site Levee Miles 3.9 Left Bank & 4.2 Left Bank

2 Documents in Project

Summary

SCH Number
2008102072
Lead Agency
Water Resources, Department of (California Department of Water Resources)
Document Title
Cache Creek North Levee Setback Project - Critical Erosion Site Levee Miles 3.9 Left Bank & 4.2 Left Bank
Document Type
NOD - Notice of Determination
Received
Posted
3/2/2009

Document Description
Two setback levees would be constructed at critical erosion sites (LM 3.9L and LM 4.2L) along the north bank of Cache Creek. The LM 4.2L setback levee would be ~670 in length and set back 90 ft from the existing levee. The new levee would be 40-50 ft wide at the base. Three 10 ft wide notches would be cut into the existing levee to allow drainage. 1,300 ft of County Road 17a would be relocated.

Contact Information
Deborah Condon
Central Valley Flood Protection Board
3310 El Camino, LL40
Sacramento, CA 95821

Phone : (916) 574-1426

Location

Cities
Woodland
Counties
Yolo
Cross Streets
County Road 17a and County Road 99a
Zip
95695
Total Acres
11
Parcel #
02716005, 02717039, & 002
State Highways
I-5, Hwy 13
Railways
Southern Pacific
Schools
Migrant Headstart Psch
Waterways
Cache Creek
Township
10N
Range
2E
Section
RioJes
Base
MDB&M

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Lead Agency
Approved On
Final Environmental Document Available at
Central Valley Flood Protection Board 3310 El Camino Avenue, Room LL40 Sacramento, CA 95821

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print