City of Oakdale Wastewater Treatment Plant (WWTP) Upgrade Project; Clean Water State Revolving Fund (CWSRF) No. C-06-4688-110

3 Documents in Project

Summary

SCH Number
2008102027
Lead Agency
Oakdale, City of (City of Oakdale)
Document Title
City of Oakdale Wastewater Treatment Plant (WWTP) Upgrade Project; Clean Water State Revolving Fund (CWSRF) No. C-06-4688-110
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2009

Document Description
The Project will upgrade the WWTP from secondary to tertiary treatment level, provide disinfection, increase capacity from 2.4 million gallons per day (MGD) to 3.04 MGD, and add additional process and hydraulic capacities. The Project also consists of aeration basin modifications including: Biolac equipment, mixed liquor pipeline and a secondary clarifier flow split structure, one additional secondary clarifier with a return activated sludge pumping station, tertiary filters, ultraviolet disinfection system, sludge dewatering facility, low-lift pump station for the teritiary filters, non-potable water pumping station, and a side streams return pumping station.

Contact Information
Michelle Lobo
State Water Resources Control BOard
Division of Financial Assistance 1001 I Street, 16th floor
Sacramento, CA 95814

Phone : (916) 341-6983

Location

Cities
Oakdale
Counties
Stanislaus
Cross Streets
Liberini Avenue ; River Road
Zip
95631
Total Acres
55
Parcel #
6-11-42
State Highways
120
Waterways
Stanislaus River
Township
2S
Range
10E
Section
10
Base
MDM

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
SWRCB 1001 I St, 16th Floor Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print