Citrus Continuation High School (CCHS)
2 Documents in Project
Summary
SCH Number
2008101128
Lead Agency
Fontana Unified School District
Document Title
Citrus Continuation High School (CCHS)
Document Type
NOD - Notice of Determination
Received
Posted
12/15/2008
Present Land Use
Public Facilities (P-PF) and Residential Community (R-PC)
Document Description
Construct and operate a new continuation high school and career technical center housing approx. 909 total students and approx. 50 staff members. The facilities would include two one and two-story classroom buildings and other supporting facilities. Approx. 760 students would be assigned to the school and approx. 150 students from Jurupa Hills HS and the Fontana Adult School may also attend for specific career technical and Regional Occupational Program (ROP) classes not able to be housed at either of those sites. Due to the close proximity of these schools, these students would walk to the career technical/vocational wing at CCHS. All included, the school would provide a total of 35 classrooms, including 27 regular teaching stations, 3 labs, 3 shops, and 2 severe special education stations and the on-site buildings would total approx. 77,696 sf. Access would be provided by Cypress Ave. via two driveways and the playfields are anticipated to be shared between FUSD and the City of Fontana through a joint-use agreement. The proposed school is scheduled to open for the 2011-2012 school year.
Contact Information
Name
Melinda A. Pure
Agency Name
Fontana Unified School District
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Bernardino
Cross Streets
Santa Ana Avenue/Cypress Avenue
Parcel #
0255-021-10, -11, -12, & -25
State Highways
I-10
Railways
UPR
Township
1N
Range
5W
Section
30
Base
SBB&M
Notice of Determination
Approving Agency
Fontana Unified School District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.