Addendum to the Recyled Water Reservoir R-41, R-42, and R-43

4 Documents in Project

Summary

SCH Number
2008101094
Lead Agency
City of Chino Hills
Document Title
Addendum to the Recyled Water Reservoir R-41, R-42, and R-43
Document Type
NOD - Notice of Determination
Received
Posted
10/19/2009
Document Description
The proposed project encompassed 3 separate recycled water storage reservoirs to deliver recycled water to irrigate landscaped areas. The objective is to replace the potable water presently being used for landscape irrigation with recycled water supplied to the City by the Inland Empire Utilities Agency. The Addendum modifies the Mitigated Negative Declaration adopted by the City in November 2008 as its CEQA environmental determination for the proposed implementation of the City's Recycled Water Reservoirs project. In summary, the proposed project modifications consist of the following actions: The recycled water pipeline to the R-41 recycled water storage reservoir will be installed from an existing pipeline that will reduce the new pipeline to about one-fourth in length of the pipeline alignment identified in the original environmental document. The recycled water pipeline to the R-42 recycled water storage reservoir will be installed from an existing pipeline that will reduce the new pipeline to about on-half the length of the pipeline alignment identifies in the original environmental document. The recycled water pipeline to the R-43 recycled water storage reservoir will be installed from an existing pipeline along an alignment comparable to the pipeline alignment identified in the original environmental document.

Contact Information

Name
Steven C. Nix
Agency Name
City of Chino Hills
Contact Types
Lead/Public Agency

Location

Cities
Chino Hills
Counties
San Bernardino
Zip
91709
Total Acres
~10
State Highways
142 Carbon Canyon Road
Township
8W
Range
2S
Base
SBM

Notice of Determination

Approving Agency
City of Chino Hills
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print