Carson JWPCP - Effluent Outfall Tunnel Project
6 Documents in Project
Summary
SCH Number
2008101074
Lead Agency
Los Angeles County
Document Title
Carson JWPCP - Effluent Outfall Tunnel Project
Document Type
NOD - Notice of Determination
Received
Posted
12/6/2022
Document Description
The Project will modify the existing ocean discharge system for the Sanitation Districts of Los Angeles County's Joint Water Pollution Control Plant (JWPCP). The Project involves the following elements: (1) construction of a working shaft site at the JWPCP, (2) the fabrication and delivery of a tunnel boring machine, and (3) construction of a 6.9-mile long onshore tunnel between the JWPCP and the existing ocean outfall manifold structure at Royal Palms Beach near White Point.
Contact Information
Name
Cedric S. Irving
Agency Name
State Water Resources Control Board
Job Title
Environmental Scientist
Contact Types
Responsible Agency
Phone
Location
Cities
Rancho Palos Verdes, San Pedro
Counties
Los Angeles
Regions
Citywide
Other Information
The Project area is situated off the Los Angeles County coast near Whites Point in Coastal San Pedro, California. The Palos Verdes Hills lie to northwest as does the Upper Reservation of Fort MacArthur and the urban core of San Pedro to the northeast. Point Fermin lies approximately 1/2-mile to the east as does Portuguese Bend 3-miles to the west. More specifically, the Project is located immediately offshore from Royal Palms Beach which lies below and just southwest of White Point Bluff Park in San Pedro.
Notice of Determination
Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On
County Clerk
Los Angeles
Final Environmental Document Available at
1001 I Street Sacramento, CA 95814
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Attachments
Notice of Determination
Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.