Santa Ana Regional Interceptor (SARI) Repairs Upstream of Prado Dam (Reaches IV-A and IV-B) Project; Clean Water State Revolving Fund (CWSRF) No. C-06-5610-110

5 Documents in Project

Summary

SCH Number
2008101050
Lead Agency
Santa Ana Watershed Project Authority
Document Title
Santa Ana Regional Interceptor (SARI) Repairs Upstream of Prado Dam (Reaches IV-A and IV-B) Project; Clean Water State Revolving Fund (CWSRF) No. C-06-5610-110
Document Type
NOD - Notice of Determination
Received
Posted
4/13/2011

Document Description
The Project will repair and extend the useful life and Reaches IV-A (both the lower and upper portions of Reach IV-A) and IV-B of the SARI pipeline network. The Project will involve slip-lining approximately three miles of the lower portion of Reach IV-A and approximately three miles of Reach IV-B, and using the cured-in-place pipeline repair for approximately five miles of the upper portion of Reach IV-A. New watertight maintenance access structures will also be installed to eliminate water intrusions.

Contact Information
Lisa Lee
SWRCB - Division of Financial Assistance
1001 I Street, 16th Floor
Sacramento, CA 95814

Phone : (916) 327-9401

Location

Coordinates
33°53'13.3"N 117°38'37.8"W
Cities
Corona
Counties
Riverside
Cross Streets
State Route 71 and State Route 91
Zip
92882
State Highways
SR 71 and SR 91
Railways
AT&SF
Airports
Corona Municipal
Waterways
Santa Ana River/Prado Dam

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
N/A

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.