Santa Ana Watershed Project Authority
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008101050
- Lead Agency
- Santa Ana Watershed Project Authority (SAWPA)
- Document Title
- Santa Ana Watershed Project Authority
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 12/30/2010
- Document Description
- CDFG is executing a Lake and Streambed Alteration Agreement (SAA # 1600-2009-0081-R6) pursuant to Section 1602 of the Fish and Game Code to the project Applicant. The Applicant is proposing to repair the existing Santa Ana Regional Interceptor (SARI) pipeline through a sliplining repair option from the manhole IV-A-0680. Sliplining is a technique that inserts a new pipeline inside of an existing pipeline. This option proposes to insert a slipline into the pipe without interrupting the service of the existing pipeline or installing any external bypass pumping requirements.
- Contact Information
-
Michael D. Flores
California Department of Fish and Game
Lead/Public Agency
Inland Deserts Region 6 4665 Lampson Avenue, Suite J
Los Alamitos, CA 90720
Phone : (909) 987-8397
Location
- Coordinates
- 33°53'13.3"N 117°38'37.8"W
- Cities
- Corona
- Counties
- Riverside
- Cross Streets
- State Route 71 and State Route 91
- Zip
- 92882
- State Highways
- SR 71 and SR 91
- Railways
- AT&SF
- Airports
- Corona Municipal
- Waterways
- Santa Ana River/Prado Dam
Notice of Determination
- Approving Agency
- CDFG
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 4665 Lampson Avenue, Suite J Los Alamitos, CA 90720
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.