Longley Well No. 3 and Camino Real Well No. 3, Project No. 6372039

4 Documents in Project

Summary

SCH Number
2008101028
Lead Agency
Arcadia, City of (City of Arcadia)
Document Title
Longley Well No. 3 and Camino Real Well No. 3, Project No. 6372039
Document Type
NOD - Notice of Determination
Received
Posted
11/8/2010

Document Description
The City of Arcadia is proposing to construct two new wells to ensure that adequate system capacity is available to use as a source of blend water to keep the existing St. Joseph Well No. 2 operating in the event one of the City's existing wells becomes inoperable. The St. Joseph well exceeds the nitrate standard. Blending all three wells will allow the city to meet the nitrate drinking water standard. A water main extension will also be constructed to connect the two new wells to the existing distribution system.

Contact Information
Shu-Fang Orr
CA Department of Public Health
CDPH Angeles District Office 1449 W. Temple Street, Room 202
Los Angeles, CA 90026

Phone : (818) 551-2045

Location

Coordinates
34°06'40"N 118°02'18"W
Cities
Arcadia
Counties
Los Angeles
Cross Streets
Palm Avenue / El Monte Avenue (Longely Well Address)
Zip
91007
Total Acres
0.21, 1.10
Parcel #
57857018900; 5781014901
State Highways
I-210
Airports
El Monte Airport
Waterways
Rio Hondo River

Notice of Determination

Approving Agency
Public Health
Approving Agency Role
Responsible Agency
Approved On
Final Environmental Document Available at
City of Arcadia 240 W. Huntington Drive Arcadia, CA 91007

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.